http://www.fullfill-eng.com
สร้างเว็บไซต์Engine by iGetWeb.com 
 Home  Aboutus  Job Reference  Test Equipment  Working  Contactus
Search  Type   Cart Order (0) 
Member
Username
Password


Forgot Password
Register
Menu
Home
Aboutus
Job Reference
Test Equipment
Working
Contactus
STAT
Open 10/09/2008
Update 19/10/2016
Unique Session367,134
Page Views437,806
Total Product 2
Link
All Partners
1

1

1


www.hotmail.com

www.yahoo.com

www.gmail.com


Aboutus

PREVENTIVE MAINTENANCE OF POWER TRANSFORMERS

Items listed below are included in the recommended major maintenance schedule for Power transformers.
  • Insulation Power Factor Including Bushings and Arrestors
  • Excitation Current Tests
  • Insulation Resistance
  • Turns Ratio Test Including LTC
  • Winding Resistance Tests
  • Bushing Current Transformer Tests (Ratio, Polarity, And Saturation)
  • External Inspection of Tanks and Accessories
  • Check Nitrogen Pressurization
  • Check LTC Remote Control and Indication
  • Check Operation of Cooling Systems (Manual and Automatic)
  • Calibration Check of Liquid Level and Temperature Gauges
  • Perform Functional Check of Control and Alarm Circuits
  • Record Transformer Loading Data
  • Extract Oil Sample

 
« October 2018»
SMTWTFS
 123456
78910111213
14151617181920
21222324252627
28293031   
 Home  Aboutus  Job Reference  Test Equipment  Working
view