Main Project Reference
|
|
Client
|
Site/Project
|
Main Contractor
|
Scop Of Work
|
Date
|
|
COCO 1 & 2
|
MAPTAPHUT
COGENERATION POWER PLANT
|
GEC ALTHOM
|
-Cabling modification in water treatment plant
-Asistance for commissioning and
start up of BOP phase I and II
|
May. '96
|
|
TPI
(RAYONG)
|
LUBE BASE OIL
LUBE BASE OIL
BOILER PROJECT
DK PLANT
SWS PLANT
EBSM
RAYPOS
|
PEREMBAKENTZ
LG ENGINEERING CO.,LTD.
SAMSUNG ENGINEERING CO.,LTD.
ABB CONTRACTING CO.,LTD
ABB CONTRACTING CO.,LTD
THAI TAE LIM CO.,LTD.
SIEMENS LTD.
|
-Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
|
May '96 - Dec. '97
|
|
TPC OXY / PVC
|
PASTE RESIN PROJECT
|
A&T INSTR.TECH
|
Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
|
Jun.'96
|
|
TPC OXY / PVC
|
PASTE RESIN PROJECT
|
A&T INSTR.TECH
|
-Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
|
Jun.'96
|
|
NPC
|
NPC MAPTAPHUT NEW
HRSG PROJECT
|
DELTAK
SDEM (THAI) CO.,LTD.
|
-Erection supervisor
-Electrical material supply
|
Jul. '96
|
|
COPELAND
|
COPE LAND BOWIN
|
ZENITH POWER & ENGINEERING CO.,LTD.
|
-Air circuit Breaker test
|
Aug. ' 96
|
|
ADVANCE AGRO
|
ADVANCE AGRO -PRACHINBURI
|
ADISA (1993)
|
-Hi-Pot Test of power cable
|
Oct. '96
|
|
SIAM PLUP.
|
SIAMPLUP & PAPER PUBLIC CO.,LTD.
CCSC And Evaporator Project
Banpong - Ratchaburi
|
AEG (THAILAND) CO.,LTD.
ADISA (1993) CO.,LTD.
|
-Test & Commissioning , start-up assistance
- Site supervisor
- Electrical commissioning
- Protective relays test
- MV and LV switch gear test
- HV, MV and LV switch gear Energization
- Batteries, Charger test and start up
- Plant Start up assistance
|
Oct. ' 96
|
|
APEX
|
APEX PETROCEMICAL CO.,LTD.
MAPTAPHUT - RAYONG
|
A&T INSTR. TECH LTD. PART.
|
-Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
-
|
Dec. '96
|
|
EGAT
|
TRAT SUBSTATION
RAYONG 2
WATTANANAKORM SUB.
CHANTABURI SUB.
SOUTH BANGKOK SUB.
|
PRECISE ENGINEERING & CONSTRUCTION- CO.,LTD.
|
- Protective relay test
- Metering
- Outdoor Switch yard
- Commissioning & Energization
|
Dec' 96 -
Feb. '98
|
|
BIG 1
|
BIG PLANT 1
|
BANGKOK INDUSTRIAL GAS CO.,LTD.
|
-Hi- Pot of power cable
|
Jun. '96 -
Jul. '96
|
|
IP-COGEN
|
IP-COGEN
EASTERN INDUSTRIAL ESTATE
|
THAIJURONG ENGINEERING CO.,LTD.
|
-Isolate phase- busduct test
(High Voltage Test)
|
Feb.' 97
|
|
THAI OIL
|
THAI OIL ADDITIONAL 2 POWER
TRANSFORMER (SUB 14,22)
|
ENCON ENGINEERING &CONSTRUCTION CO.,LTD.
|
-Test & Commissioning 2 Line power transformers
-Modification control panel
|
Mar.'97-
Apr. '97
|
|
NSM (BOWIN)
|
NAKORN THAI STRIP MILL CO.,LTD.
BOWIN - CHONBURI
|
SIEMENS LTD,
NAKORN THAI STRIP MILL CO.,LTD.
|
-MCC Individual & Function test
|
Aug. '97-
Jan. '98
|
|
COSMO OIL
|
PETCHABURI TERMINAL CO.,LTD.
Petchaburi Tank Farm & Platform
On shore & Off shore
|
PMCI CO.,LTD.
|
-Electrical Test & Commissioning
-Energization
|
Sep. '97 -
Oct. '97
|
|
BIG2
|
BIG 2
|
BANGKOK INDUSTRIAL GAS CO.,LTD.
|
-Hi-Pot test of power cable
|
Oct. '97
|
|
PRATHUMTHANI
|
PRATHUMTHANI WATER-
TREATMENT CO.,LTD.
|
PMCI CO.,LTD.
|
-Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
|
Oct. '97
|
|
TPC/VCM
|
VCM EXPANSION PROJECT
|
ABB CONTRACTING CO.,LTD.
|
-Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
|
Oct. '97
|
|
TPAC
|
PADAENG -TPAC
|
THAI POLY ACETAL CO.,LTD.
|
-YEARLY maintance, plant protection inspection test
-Calibration
|
Dec. '97
|
|
SUS
|
SIAM UNITED STELL CO.,LTD.
Eastern Industrial Estate- Rayong
|
SIAM DEKI ENGINEERING CO.,LTD.
MITSUBISHI ELECTRIC CORPORATION
|
-6.6 kV Protection relay test
|
Jan' 98
|
|
ROC
|
RAYONG OLEFINS CO.,LTD.
TANK TERMINAL SITE 6
|
SKEC (THAI) LTD.
AMC CO.,LTD.
|
-Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
-Hi-Pot test of power cable
|
Mar. '98
|
|
EGAT
|
RATCHABURI SUBSTATION
|
SIEMENS LTD.
|
-Distance Individual test
-Line Protection Function Test
|
Apr. '98-
May '98
|
|
IP-GOGEN
|
IP-COGEN
(HEMARAJ)
|
OPERATIONAL ENERGY GROUP LTD.
|
-YEARLY maintance, plant protection inspection test
-Calibration
-Test & Commissioning , start-up assist
- Electrical equipments/systems including
- Protection systems.
- Power transformer
- 6.9 kV Switchgears, Busducts.
- SUS, MCC
- Batteries, Charger AC/DC Distribution Systems.
|
Jun. '98
|
|
BIG
|
BANGKOK INDUSTRIAL GAS 2
|
FLUOR DANIEL EASTERN, INC.
|
- HI-POT TEST OF POWER CABLE
|
Jun-98
|
|
CDT
|
CDT BANKAI - RAYONG
|
POWER LINE ENGINEERING CO.,LTD.
|
- HI-POT TEST OF POWER CABLE
|
Jul-98
|
|
EGAT
|
115 kV, 230 kV, 500 kV
SAINOI SUBSTATION
|
TOTEMS CONSTRUCTION CO.,LTD.
|
-High voltage electrical equipment testing
- Capacitor Voltage transformer 500kV, 115kV, 230 kv
- Current transformer ( 500 kV) , 230 kV, 115 kV
- Power Circuit Breaker 230kV, 115kV
- Disconnecting switch 230 kV, 115 kV,
-DC/AC Systems
-Protective relay Testing
- Line protective Relay (GEC)
- Transformer protective relay (GEC)
-Transducer Testing
- WATT,VAR,Volt, Amp, Resistance
- Tap (Power Transformer) transducer.
|
Jul-98
|
|
SIAM ELECTRIC
|
115 kV ( SIAM ELECTRIC SUBSTATION)
|
TOTEMS CONSTRUCTION CO.,LTD.
|
-Test & Commissioning Line power transformer 115kV,
- AC/DC System
- Switch gear testing
- Energize 115kV and 22kV switchgear
- Power transformer test
-
|
Jul-98
|
|
PEA
|
V-SHAPE PROJECT / SUBSTATION
NAKORNSAWAN SUBSTATION
SRITHAT SUBSTATION
SEKA SUBSTATION
CHIANGKHAN SUBSTATION
CHAINAT SUBSTATION
DANSAI
|
JOINT VENTURE ALCATEL CONTRACTING
GMBH & ELIN ENERGIETECHNIK GMBH
|
-Test & commissioning 115kV/22kV Substation
- Switch gear 22kV test
- 115kV High Voltage electrical Equipment test
- Line protectivr relay test (AEG)
- Transformer protective relay test (AEG)
- Engergize 115/22 kV Substation
- AC/DC System
- Computer Control system check (DCS)
|
Jul-98
|
|
SAHAPHAT
GROUP
|
SAHACOGEN POWER PLANT
ROJANA POWER PLANT
SURIN
PAYAKKHAPHUMPHISAI
|
THAI NEPCO CO.,LTD.
|
-Test & commissioning Electrical power system in power plant
- Generator protection test
- Assistance for Generator synchronization.
- Switchyard equipment & Protection , control test
- Power transformer, protective relay (ABB),
- function test
- Switchgear 12, 3.3 kV test (ABB).
- Low Voltage electrical power test
- Battery & charger test
- 115 kV Switch yard
- Relay & Metering Panel
|
Aug-98
Feb-99
Apr-99
|
|
TRI ENERGY
COMPANY
|
230 kV, 6.9 kV and LV System at TRI ENERGY POWER RATCHABURI 700 MW POWER PLANT
|
THAI JURONG ENGINEERING CO.,LTD. / BVI
|
- 230 kV Switchyard
- 6.9 kV Switch gear
- SUS & MCC
- 315 MVA Power Transformer ( Hyundai)
- Protective Relay Metering
- AC/DC System
- Generator Protection System
- Start Up MV/LV Motor
|
Feb-99
|
|
PEA
SUBSTATION
|
- 115 KV, 22 KV SUBSTATION
- -BANGKLA- CHACHOENGSOA
- -SALAYA - NAKORNPRATHOM
- -SAMKOK - PRATHUMTHANEE
- -UTHONG -SUPHANBURI
- -DAMNERNSADUAK- RATCHBURI
- -PAKTHOR -RATCHABURI
-
|
Hyundai Engineering & Construction Co.,ltd.
SEJONG E.M.I.C. Tecnology Co.,ltd.
|
-High Voltage
- 115 kV Switchyard
- 115 kV GIS
- Power Transformer ( GEC Alsthom)
- 22 kV Switch gear
- AC/DC System
- Relay Protection
- Energization
|
Jan-99
Mar-99
Mar-99
Jul-99
Jul-99
Aug-99
|
|
PEA
SUBSTATION
|
115 kV , 22 kV Substation
SRAKEAW
|
ENCON ENGINEERING & CONSTRUCTION CO.,LTD.
|
-High Voltage
- 115 kV Switchyard
- Power Transformer (Dihen or Ekarat)
- 22 kV Switch gear
- AC/DC System
- Relay Protection
- Energization
|
Dec-99
|
|
LEAMCHANBANG
PORT
(PHASE II)
|
115 kV , 22 kV Substation
|
ITALIAN THAI PUBLIC CO.,LTD.
|
- 115 kV Switchyard
- Power Transformer (ABB)
- 22 kV Switch gear
- AC/DC System
- Relay Protection
- Energization
|
Dec-99
|
|
Fujisu factory
|
115 kV GIS , 22 kV
|
FUJIDENKI CO.,LTD.
|
- 115 kV GIS
- Power Transformer (Fuji Electric)
- 22 kV Switch gear
- Relay & Metering
- AC/DC System
- Commissioning Work
|
Jan-00
|
|
PEA Substation
|
I-Shape Project
Soulth of Thailand
|
Samsung Engineering Co.,ltd
|
- 115 kV Switchyard
- 33 kV GIS
- Power Transformer (ABB)
- Relay & Metering
- AC/DC System
- Commissioning Work
|
Jan-00
|
|
PEA
SUBSTATION
|
115 KV, 22 KV SUBSTATION
- PHONPHISAI - NONGKHAI
- KRANUAN - KHONKHAN
- NONGRUA - KHONKHAN
- KASEDVISAI - ROI-ED
- SRISONGKRAM -NAKORNPHANOM
|
B.Grimm Engineeering System(Public)Co.,ltd.
- Encon Engineering & Construction Co.,ltd
- Centerpoint Industry Co.,ltd
|
-High Voltage
- 115 kV Switchyard
- 115 kV GIS
- Power Transformer ( GEC Alsthom)
- 22 kV Switch gear AC/DC System
- Relay Protection
- Energization
|
May-00
May-00
May-00
Jun-00
Aug-00
|
|
Department of
SCIENCE
|
DOKKHAMTAI -PHAYAO
|
Charoenkrung Engineering Co.,ltd.
|
- Relay Testing
- Protective relay for Generator Protection
|
Dec-00
|
|
COLONE B
POWER PLANT
|
COLONE B Power Station Gas Turbine
Combined Cycle Project (MACAO)
|
Hyundai Engineering & Construction Co.,Ltd.
|
- Individual Test of 230 kV System
- MV Switchgear of 110 kV & 6.6 kV System
- Relay Testing
- Protective Relay & Metering test
|
|
|
JONG SATIT
INDUSTRIAL
|
ELECTRICAL P.M.
|
Schneider Electric High Voltage (Thailand) Ltd.
|
- Individual Test OF 115 kV
- Disconnecting Switch , Lighning Arrester
- CVT, Circuit Breker, VT, NGR, Oil of Power TR.
- Bus & Joint Test, Post Insulator, AC& DC Board
- Battery & Battery Charer
- 50 kVA Station service Transformer
- Commissionng & Function Test
- Engerization
- Relay & Metering Test
|
Oct-01
|
|
CARPET
INTERNATIONAL
Co.,Ltd.
|
115 kV & 110 kV System
|
Schneider Electric High Voltage (Thailand) Ltd.
|
- Individual Test
- Disconnecting Switch , Lighning Arrester
- 110 kV of Current Transformer
- 115 kV Test of CVT, Circuit Breaker
- Station service Transformer
- AC & DC Board, Earth Test, Joint Resistant Test
- MV Switchgear
- Commissionng & Function Test
- Relay & Metering Test
|
Jan-02
|
|
AMMATA
POWER PLANT
|
AMMATA REMOTE SUBSTATION
AMMATA POWER STATION
|
Siemens Ltd.
BGES Engineering System (Public) Co.,Ltd.
|
- Individual Test
- Disconnecting Switch , Lighning Arrester
- Relay & Metering Test
|
Nov-01
|
|
THAI CARBON
POWER STATION
|
THAI CARBON BLACK-ANGTHONG
|
Encon Engineering & Construction Co.,Ltd.
Siemens Ltd.
|
- Relay & Metering Test
- Individual Test
- Commissionng Work
- Function & AC Withstand Test
|
Dec-01
|
|
SUS
|
SIAM UNITED STEEL CO.,LTD.
Eastern Industrial Estate-Rayong
|
FUJIDENKI ENGINEERING CO.,LTD.
|
-YEARLY maintenance for, plant protection inspection test 115, 22 & 6.6 kV System
- Relay Testing
- Protective Relay & Metering test
- VCB Testing
- Functional Test for 115 , 22 & 6.6 kV Test
|
On Jan'02
|
|
BANGBO
Power Plant
|
BANG BO CCP
Bang Bo Power Plant (Samuthprakarn)
|
ALSTOM POWER (THAILAND) Ltd.
|
- Individual Test of 230 kV System
- Disconnecting Switch , Lighning Arrester
- Current Transformer
- CVT, Circuit Breaker
- Power Transformer
- Ground Resistant Test
- MV Switchgear
- Relay Testing
- Protective Relay & Metering test
|
Jan-02
|
|
THASCO
|
THASCO- Maptaphut Rayong
|
SK. Switch board&Engineering (1999) Co.,Ltd.
|
- Electrical & Preventive Maintenance Test
|
Jan-02
|
|
ViNYTHAI
|
VINYTHAI-Maptaphut Rayong
|
Rayong Engineering & Plant Service Co.,Ltd.
|
- Electrical & Preventive Maintenance Test
- 115 kV System, 22kV System & LV System
|
Jan-02
|
|
SMPC
|
SIAM MITSUI PTA CO.,LTD.
|
Siam Mitsui PTA
Rayong Engineering & Plant Service Co.,Ltd.
Encon Engineering & Construction Co.,Ltd.
|
- Electrical & Preventive Maintenance Test
- 115 kV System, 22kV System & LV System
|
Jan-02
|
|
SUNVALLE S/S
|
SUNVALLE SUBSTATON- SARABURI
|
TACCO GENERATION CO.,LTD.
|
- Relay & Metering Test
- Individual Test
- Commissionng Work
- Function & AC Withstand Test
- 115 kV System, 22kV System & LV System
|
Jan-02
|
|
THAI OIL CO.,LTD
|
THAI OIL SUBSTATION
|
SRI U THONG CO.,LTD
|
- Electrical & Preventive Maintenance Test
- 115 kV System, 22kV System & LV System
|
|
|
THAI OIL CO.,LTD
|
THAI OIL SUBSTATION
|
THAI OIL Co.,Ltd.
|
- Relay & Metering Test
- Individual Test
- Commissionng Work
- Function & AC Withstand Test
|
|
|
MSC
|
MITSUBISHI MOTOR - MSC
LEAMCHABANG
|
FUJIDENKI ENGINEERING CO.,LTD
|
- Electrical & Preventive Maintenance Test
- 115 kV System, 22kV System & LV System
|
|
|
YOKOHAMA TIRE
MANUFACTURING (THAILAND)
|
BOWIN- CHONBURI
Site test & Commissioning work
|
Fuji Electric Technology
|
- 115/22 kV And 6.3 kV Individual test
- Protective relay, VCB, Functional Test
- 6.3kV Transformer, CT, PT, Ratio, Polarity test
- AC Hi-Pot Test, Main circuit test, Sequential check
- 6.3 kV and 115 kV Load break test - 115 GIS AC witchstand High Voltage test
- 115 GIS AC witchstand High Voltage test
|
SEP-04
|