http://www.fullfill-eng.com
สร้างเว็บไซต์Engine by iGetWeb.com 
 Home  Aboutus  Job Reference  Test Equipment  Working  Contactus
Search  Type   Cart Order (0) 
Member
Username
Password


Forgot Password
Register
Menu
Home
Aboutus
Job Reference
Test Equipment
Working
Contactus
STAT
Open 10/09/2008
Update 19/10/2016
Unique Session368,176
Page Views439,405
Total Product 2
Link
All Partners
1

1

1


www.hotmail.com

www.yahoo.com

www.gmail.com


Aboutus

UPS Systems

Perform scheduled field maintenance of UPS systems. Testing and inspections will be performed in accordance with manufacturers' instructions and service manuals, ANSI/IEEE standards and Full Fill recommended standard maintenance guidelines for UPS systems.
Inspect UPS system for physical damage.
  • Compare equipment nameplate information and connections with single line diagram and report any discrepancies.
  • Check tightness of all control and power connections.
  • Perform transfer operation.
  • Measure contact resistance in normal and alternate source position.
  • Set and calibrate in accordance with manufacturer's literature.
                             - simulating loss of normal power
                             - loss of emergency power
                             - return of emergency power
                             - return of normal power
  • SCRs for correct operation
  • Battery for correct voltage
  • Monitor and verify correct operation and timing of all relays

 
« November 2018»
SMTWTFS
    123
45678910
11121314151617
18192021222324
252627282930 
 Home  Aboutus  Job Reference  Test Equipment  Working
view