ÊÃéÒ§àÇçºEngine by iGetWeb.com

Aboutus

Medium Voltage Power cables

Perform preventive maintenance on Power cables. Items listed below are included in Full Fill recommended major maintenance schedule for cables.
  • Inspect for Physical Damage
  • Inspect for Shield Ground Continuity
  • Perform Insulation Resistance Test on each Conductor
  • Perform DC High-Potential tests on each Conductor in Accordance with ANSI/IEEE Std 400
  • Perform AC Power Factor Test (Optional)

A well-designed database provides you with convenient access to the information you want.

view